Marine Technology Jobs
Search for Jobs
Keywords (e.g. Acoustic Engineer or Oceanographer)
 
Jobs
 
Post a Marine Technology Job

Search for Jobs
Keyword (e.g.Oceanographer)

Post Resume

Search Resumes
Keyword (e.g. Engineer)

Job/Resume Manage

Subscribe to Marine Technology Reporter
Life Support Supervisor

Education, Experience & Location
Resume ID: 102453
Location: Italy Italy Manziana (Rome)
Education: High school
Experience: 20+ Years
 

Resume
Objective
Life Support Supervisor conducting Saturation Systems

Work Experience
Period: 04 – 10 – 1967 till 31 - 12 - 69
Position: Air Diver
Vessel:
Client: Italian Navy
Project/Location: Cosubin Varignano La Spezia Italy
Work Description: Training course and SDAI in the Navy and destinations in various locations

Period: 06 06 1970 till 10 08 1970
Position: Air diver
Vessel: Shore Work
Client: Agip
Project/Location: Marghera Refinery Venice
Work Description: Demolition of Wall to allow water entering

Period: 13 09 1970 till 20 12 1970
Position: Air Diver
Vessel: Shore Dam
Client: Warter and electricity of Sudan
Project/Location: Kashmel Girba Sudan
Work Description: To Clear aspirations gates from debris

Period: 02 06 1971 till 10 09 1971
Position: Air Diver
Vessel: Shore
Client: Shell BP.
Project/Location: Warry Nigeria Shell Bp
Work Description: General maintenance and services

Period: 20 11 1971 till 12 08 1973
Position: Air Diver
Vessel: Shore
Client: Agip Saipem
Project/Location: Tanzania Dar es Salaam
Work Description: To make a trench on reef using also explosives and lay pipe line till SbM Boa and connection .


Period: 15 09 1973 till 18 12 73
Position: Air diver
Vessel: Saipem Castoro 4
Client: Saipem
Project/Location: Busheer
Work Description: Pipe line lay , risers and flanges installation

Period: 06 04 1974 till 10 06 1974-----------and --------09 08 till 03 11 1974
Position: Air diver
Vessel: Castoro 6
Client: Saipem
Project/Location: Emirates
Work Description: Pipe line to lay , Spool peaces assembly and flanges installation

Period: 11 01 1977 till 14 03 77
Position: Air Diver
Vessel: Freebooter
Client: Sub Sea Oil Services
Project/Location: Porto santo Stefano Italy
Work Description: Cutting and Welding training plus use and practice of surface demand and special apparatus as Sms 1 for deep diving to follow deep diving gas mix training course

Period: 16 03 77 till 04 05 77
Position: Gas mix training air diver
Vessel:
Client: Sub Sea Oil Services and Shell BP
Project/Location: Wet and Dry Zingonia Bergamo Italy
Work Description: Simulation of gas mix dives in real pression to become Sat Diver

Period: 23 05 1977 till 29 06 1977
Position: Sat Diver
Vessel: Capalonga Mv
Client: Shell BP
Project/Location: Auk Alfa north sea
Work Description: To clear area from debris

Period: 18 09 77 till 16 10 77
Position: Sat Diver
Vessel: Capalonga Mv
Client: Shell BP
Project/Location: Dan Alfa North Sea
Work Description: Corrosion Tests photos MPI

Period: 01 12 77 till 02 01 78
Position: Sat Diver
Vessel: Capalonga Mv
Client: Shell BP
Project/Location: Brent north sea
Work Description: Saturation to corrosion test

Period: 31 05 1978 till 11 07 78
Position: Sat Diver
Vessel: Capalonga Mv
Client: Shell BP
Project/Location: Brent norh sea
Work Description: Saturation Ndt MPI Cleaning areas

Period: 21 07 1978 till 11 08 1978
Position: Sat Diver
Vessel: Semac Lay Barge
Client: Shell BP
Project/Location: Brent /A North Sea
Work Description: Spool peaces assembly and Measures for other Spool

Period: 25 09 1978 till 28 10 1978
Position: Sat Diver
Vessel: Capalonga
Client: Shell BP
Project/Location: Auk/a Brent/D
Work Description: Inspections NDT MPI PHOTOS

Period: 12 08 1979 till 15 09 1979
Position: Sat Diver
Vessel: Capalonga
Client: ShellBP
Project/Location: Brent North Sea
Work Description: Cleaning MPI debris

Period: 10 10 1978 till 27 10 78
Position: Sat Diver
Vessel: Capalonga
Client: Shell BP
Project/Location: Brent North Sea
Work Description: Clamps fittings debris Ndt photos

Period: 28 11 78 till 26 12 78
Position: Sat Diver
Vessel: Capalonga
Client: ShellBP
Project/Location: Brent North sea
Work Description: Debris Inspections photos MPI

Period: 03 02 1979 till 28 02 1979
Position: Sat Diver
Vessel: Capalonga
Client: Shell BP
Project/Location: Brent North Sea
Work Description: Clamps inspections istallation MPI

Period: 23 04 79 till 06 05 1979
Position: Sat Diver
Vessel: Capalonga
Client: Shell BP
Project/Location: Brent North SEA
Work Description: General maintenance MPI NDT PHOTOS

Period: 06 06 1979 till 10 07 1979
Position: Air Diver
Vessel: Scarabeo 3 Saipem
Client: Saipem Agip
Project/Location: Lybia
Work Description: Assistence to Closed bell modular

Period: 09 02 1980 till 24 02 1980
Position: Sat Diver
Vessel: Capalonga
Client: Shell BP
Project/Location: Shetland Ilands
Work Description: Cadweld on pipe line (Welding anodes)

Period: 27 03 81 till 16 04 81
Position: Sat diver
Vessel: ArcticSeal
Client: Shell BP
Project/Location: North Sea
Work Description: Spool Peaces assembly Sand bagging

Period: 17 05 81 till 05 06 81
Position: Sat diver
Vessel: Arctic Seal
Client: Shell BP
Project/Location: North Sea
Work Description: MPI Inspect. Cleaning nodes

Period: 03 07 81 till 01 08 1981
Position: Sat diver
Vessel: Arctic Seall
Client: Shell BP
Project/Location: North Sea
Work Description: Pibe Line joint sand bagging and photos MPI

Period: 04 03 1982 till 27 03 1982
Position: Sat Diver
Vessel: Arctic Seal
Client: Shell BP
Project/Location: Brent /B Cormoran Alfa
Work Description: Works on igloo

Period: 12 07 82 till 07 08 82
Position: Sat Diver
Vessel: Arctic Seal
Client: Shell BP
Project/Location: North Sea Cormoran
Work Description: Jointing hoses to flanges water jetting cleaning photos

Period: 20 09 82 till 15 10 82
Position: Sat Diver
Vessel: Arctic Seal
Client: Shell BP
Project/Location: North Sea
Work Description: Sand Bagging at span flag photos

Period: 19 04 1983 till 14 05 83
Position: Air Diving
Vessel: Buccaneer Congo
Client: Agip Eni
Project/Location: Loango field
Work Description: Cleaning by water jet brushes MPI NDT inspect

Period: 15 05 83 till 14 06 83
Position: Sat Diver
Vessel: Buccaneer mv
Client: Agip Eni Congo
Project/Location: Loango field Cong
Work Description: NDT on Knots

Period: 25 07 83 till 30 08 83
Position: Sat Diver
Vessel: Buccaneer mv
Client: Agip Eni Congo
Project/Location: Loango field
Work Description: NDT MPI POTOS on Knots

Period: 20 11 1983 till 19 12 83
Position: Sat diver
Vessel: Bucaneer Mv
Client: Agip Eni Congo
Project/Location: Loango fields
Work Description: NDT MPI Photos, repair damages of corrosion

Period: 05 04 84 till 28 04 84
Position: Sat Diver
Vessel: Buccaneer mv
Client: Agi Eni Congo
Project/Location: Loango Field
Work Description: MPI NDT Inspect repair damages corrosions

Period: 08 10 84 till 27 10 84
Position: Sat Diver
Vessel: Saipem Crawler Lei Barge
Client: Saipem
Project/Location: BODP/Sarawac Malaysia
Work Description: Assistance To lei Barge production

Period: 29 10 84 till 24 11 84
Position: Air diver
Vessel: Saipem Crowler
Client: Saipem
Project/Location: Sarawak Malaysia
Work Description: Pipe Line till shore removing drums

Period: 28 03 86 till 26 04 86
Position: Sat Diver
Vessel: Buccaneer Mv
Client: Agp Eni Congo
Project/Location: Loango Field
Work Description: Grining and repairing corrosion Cutting Bressing damaged

Period: 14 11 86 till 15 12 86
Position: Sat Dver
Vessel: Buccaneer Mv
Client: Agip Eni Congo
Project/Location: Loango Field Congo
Work Description: Cutting Frame conductor , Putting Clamps brace on sostitution

Period: 01 06 87 Till 20 10 87
Position: Sat Diver
Vessel: Buccaneer Congo
Client: Agip Eni Congo
Project/Location: Loango field
Work Description: Putting blocks to anchor strings for cathodes protection, and fixing stings

Period: 01 05 89 till 30 09 89
Position: Sat Diver
Vessel: Anfitrite mv
Client: Agip
Project/Location: Adriatic Sea Italy
Work Description: NDT MPI Knots control

Period: 01 02 90 till 31 10 90
Position: Sat Diver
Vessel: Anfitrite mv
Client: Agip
Project/Location: Adriatic sea Italy
Work Description: Spool Peaces and risers installing NDT MPI

Period: 01 08 91 till 31 10 91
Position: Sat Diver
Vessel: Dynanic Installer
Client: Lybian and Agip
Project/Location: Buri Field
Work Description: Debris MPI NDT Cleanig knots

Period: 01 07 92 31 10 92
Position: Sat diver
Vessel: Anfitride mv
Client: Agip
Project/Location: Adriatic Sea
Work Description: General services and Maintenaces MPI NDT

Period: 19 06 95 till 19 08 95
Position: Sat Diver
Vessel: cho chang constrouction
Client: as above
Project/Location: Tai Pei Taiwan
Work Description: Assrmbly Pipe Line for Waste Material elimination in sea water

Period: 26 09 95 till 27 11 95
Position: Sat Diver
Vessel: Cho Chang Constuction
Client: as above
Project/Location: Tai Pei Taiwan
Work Description: AS Above

Period: 01 11 96 till 23 01 97
Position: Air Diver appointed for Supervisor
Vessel: Crowler Lay Barge
Client: Saipem
Project/Location: Adriatic sea
Work Description: Spool peaces and camps assembly

Period: 01 06 99 till 31 07 99
Position: Ass. LST Tecnitian
Vessel: Petrobell Petrojet
Client: Petrobell Egypt
Project/Location: Suez
Work Description: Assistence to Saturation panel

Period: 01 01 99 till 01 05 2001
Position: Appointed air Diving supervisor and Diver
Vessel: Q Chem Qatar Shore
Client: Qatar Petroleum
Project/Location: Industrial Estate
Work Description: Building And Leveling for quay bench and mouring approch

Period: 01 09 2001 till 31 12 2001
Position: Sat Diver
Vessel: Lay Barge Cooec
Client: Chevron
Project/Location: Checron Field
Work Description: Layng Pipe and Spool peaces assembly and sand bagging

Period: 10 06 2002 till 31 07 2003
Position: Air Diver appointed for Diving Supervisor
Vessel: Shore
Client: Qatar Petroleum Fincosit ( G.L.F.)
Project/Location: Doha industrial area
Work Description: Leveling and building Mouring Dulphins and Quay

Period: 14 09 2003 till 31 10 2003
Position: Air Diver appointed Diver Supervisor
Vessel: Kanta
Client: Petrobel Egypt
Project/Location: Suez
Work Description: To cover pipe line by jetting cover machine under bottom

Period: 14 07 2005 till 08 09 2005
Position: Air Supervisor and Diver
Vessel: Adams surveyor
Client: Agip Eni Congo
Project/Location: Loango field Point Noire
Work Description: Saturaton Panel and assistence

Period: 29 09 2005 till 29 11 2005
Position: Air Supervisor and Diver
Vessel: Adams Surveyor
Client: Agip Eni Congo
Project/Location: Loango field Point Noire
Work Description: Saturation Panel and Assistence

Period: 26 03 2006 till 28 April 2006
Position: Air supervisor and diver
Vessel: Dynamic Installer
Client: Agip Eni Congo
Project/Location: Loango field Point Noire
Work Description: NDT MPI Cleaning knots by sand jetting

Period: 05 August 2006 till 03 October 2006
Position: LST - LSS -
Vessel: Team Muscat
Client: Petrobel Agip Egypt
Project/Location: Port Said area
Work Description: Saturation Controll Panel and assisting Closed Bell Diving Supervisor

Period: 18 November 2006 till 15 February 2007
Position: LSS Life support Supervisor SMIT Terminals
Vessel: Bourbon Peridot
Client: HESS
Project/Location: MALABO Equatorial Guinea
Work Description: Spool Peaces assembly and Hoses Replacement

Period: 02 March 2007 Till 09 March 2007-03-19
Position: LSS – Life Support Supervisor (Smit Terminals)
Vessel: Dulphine
Client: Horizont - Ghana
Project/Location: Ghana
Work Description: Preparing some gas mix quads to next bounce diving Job


Period: 20th of May till 25th of June 2007
Position: LSS
Vessel: Marmaid Commander
Client: Chevron
Project/Location: Gulf of Thailand
Work Description: Sat control Panel and Lss dutys 12 Men System two bell run

Period: 19th of July till 7th of August 2007
Position: LSS (Smit Terminals)
Vessel: Saipem3000
Client: Saipem
Project/Location: Point Noire Loango Ikalou
Work Description: Sat control Panel Gas Mixing lss dutys

Period: 20th of August till 31st October 2007
Position: LSS (Smit Terminals)
Vessel: Saipem 3000
Client: Saipem
Project/Location: Loango Ikalou
Work Description: Sat control Panel mixing gas Lss dutys

Period: 2nd December till 27th January 2008
Position: LSS
Vessel: PMS11 and DpVessel Mayo
Client: Petrobel Egypt
Project/Location: Port Said
Work Description: Risers and Spool Peaces assembly Saturation

Period: 18th April till 22nd June 2008
Position: Lss
Vessel: Seamac Pricess Diving Vessel By Dulam (12 Man Divex System)
Client: Qatar Petroleum
Project/Location: Doha Qatar
Work Description: Spool Peaces assembly by 3 man bell run in new Divex sat system Sat

Period: 25th June 2008 till 10th July 2008
Position: LSS (Smit Terminals)
Vessel: Saipem 3000
Client: Saipem
Project/Location: Point Noire
Work Description: Spool Peace assembly Saturation

Period: 22 August 2008 Till 2Nd October 2008
Position: LSS (Smit Terminals)
Vessel: Saipem 3000
Client: Saipem
Project/Location: Point Noire Angola
Work Description: Spool Peace Assembly In Saturation

Period: 1st of March 2009 Till 10th June 2009
Position: LSS (Hydrodive)
Vessel: Saipem 3000
Client: Saipem
Project/Location: Angola
Work Description: Spool Peace 45 inch assembly saturation ( 9 Men System )

Period: 17th August 2009 Till 28 September 2009
Position: Life Support Supervisor Smit Terminals
Vessel: Team Muscat
Client: MARSK Petroleum
Project/Location: Qatar
Work Description: Salvage work by Smit recover Cutted Dilling Leggs on bottom

Period: 8th December 2010 Till 8th January 2011
Position: Life Support Supervisor
Vessel: MSV dp3 BOTNICA
Client: Agip Croatia
Project/Location: Croatia Adriatic sea
Work Description: Spool pieces assembly in saturation system

Period:


Education
Hight School

Certification
All Imca certs
 

Contact Candidate by Email
To maintain candidate's privacy we do not reveal contact information.
Please use the form below and your request will be emailed directly to the candidate.
Your Name*:
Your Email*:
Message*:
 
marine jobs, marine recruitment, marine industry jobs, marine technology job, naval architecture jobs, marine engineering jobs, marine careers, marine engineer vacancies, maritime job, oceanography jobs, oceanographer , diving jobs, marine science jobs
Oceanography Marine Job
| News | Email News | Rss Feeds | Archive | Calendar | Jobs | MTR Magazine | Advertising | Directory | Contact Us |
editor admin © 2005-2008 New Wave Media Int'l Corporation. Developer: Vladimir Bibik.